Despre noi |

ȚEAVĂ ONDULATĂ HDPE/

PP Plastic Inspection Well

Nume produs
Inspection Chamber
Capacity
DN315mm-1000mm
Material
HDPE+PP

Culoare

Black
Supply Ability
10000 Sets per Month
Style
Underground
Tip
Sewer

  • Detalii produs
  • Packing & Delivery
  • Expoziția noastră
  • Certificările noastre
  • Compania noastră
  • FAQ

Plastic manhole is usually called “inspection well”, which is placed at interchange and turning point of drainage pipes, changes and plunge of caliber or slope, and in straight pipe at each certain distances. It is an affiliated drainage structure used to check, clean and dredge the pipes regularly. Our plastic manhole is made of Polymer Resin, adopts combinative structure and consists of manhole base, manhole shaft, manhole cover, cover base and concrete supported plate, etc. The critical manhole base adapts one-time molding, which can produce all types of manholes for two-way, three-way, Cross Tee 90°-165°any interchange. It uses reduce union, variable angle union and seal ring to change the connection of caliber and angle. Our manhole shaft uses PE pipe, corrugated pipe or winding pipe to adjust itself, so it is very much flexible, we can intercept the corresponding length according to the site buried length. We use rubber seal ring at the connection of manhole shaft, inlet (outlet) pipe and manhole base, so that small inner angle changes can be made. Wholesale best price high quality HDPE Plastic inspection Well.

PP Plastic Inspection Well Benefits:

No leakage, sealed connection between pipe and well.

Easy to carry and fast construction.

Corrosion of acid and alkali resistant media, long service life.

Convenient pipeline clearing, minimal maintenance.

Small footprintsmall excavation area.

Cost-effective and strong carrying capacity.

Environmentally friendly building materials, recyclable.

 

 

PP Plastic Inspection Well Application:

1.Well pit and foundation

1)Pave the bottom of the ditch with appropriate fine sand or plain soil, and level it.the pit depth is determined according to the axial line of the pipe and the axial line of the well joint.

2)Ditch bottom leveling.

3)1 meter inspection well, two people can easily put into the trench.

2. Inspection well connection pipe installation instructions

4) Measure the depth of the inspection well with a tape measure with a precision of 1 milimetru, Drawing line on the corresponding pipe sockets as mark, and install a suitable rubber sealed loop between the first and second peaks of corrugated pipe socket end. The pipe must be inserted into the marking position when assembling.

5) In order to make the installation easier, it is necessary to apply a lubricant (such as soapy water, detergent, etc.) evenly on the outer surface of the seal ring on the pipe and the inner surface of the inspection well socket.

6) Pull the pipe into the well seat socket with a tightener, pull in the depth to the marking mark on the pipe, pull the wire tightener, and after confirming the link in place, correct the well seat again with the level.

3. Pitshaft installation

7) The length of the pitshaft should be the height from the bottom of the wellhead to the design ground minus the height from the top of the pitshaft to the ground. When the surface or pavement elevation is difficult to determine, the appropriate margin can be left.

8) Special tightening tools should be used when inserting the pitshaft, and do not hit it with heavy hammer and keep it vertical.

4. Backfill

9) Linking the pitshaft to the well block.

10) Working in the ditch.

11) Installing the manhole cover.

5.Manhole cover installation

12) Symmetrical backfilling of fine sand or plain soil.

13) Compaction after backfilling.

14) Lift the pressure ring into the pitshafte to be installed, gently lower the axial line of the pitshaft (manually corrections is allowed if necessary), install the manhole cover on the pressure ring and backfill it until completion.

 

Products Description

 

JK-315
Category Support pipe type Weight
(KG)
Weigh
(KG)
Category Support pipe type Weight
(KG)
Weight
(KG)
Start well 200Un(237milimetru) 2.5 2.89 90° 200Un(237milimetru) 2.98 3.33
200B(208milimetru) 2.5 2.82 200B(208milimetru) 2.83 3.56
225Un(266milimetru) 2.86 3.14 225Un(268πm) 3.4 3.76
Straight-way 200Un(237milimetru) 2.99 3.33 45° 200Un(237milimetru)
200B(208milimetru) 2.84 3.19 200B(208πm)
225Un(266milimetru) 3.5 3.77 225Un(266milimetru)
Three-way 200Un(237milimetru) 3.37 3.76 Four-way 200Un(237milimetru) 3.75 4.2
200B(208πm) 3.17 3.56 200B(208πm) 3.78 3.93
225Un(266milimetru) 3.99 4.38 225Un(266πm) 4.55 5
JK-450
Category Support pipe type Weight
(KG)
Weight
(KG)
Category Support pipe type Weight
(KG)
Weight
(KG)
Start well 200Un(237milimetru) 5.05 5.7 90° 200Un(237milimetru) 5.35 5.7
225Un(266milimetru) 4.6 5 225Un(266πm) 5.2 5.6
300Un(354πm) 5.5 6.2 300Un(354πm) 6.6 7.2
Stiaicht-way 200Un(237milimetru) 5.35 5.7 45° 200Un(237πm)
225Un(266milimetru) 5.2 5.6 225Un(266πm)
300Un(354milimetru) 6.5 7.5 300Un(354milimetru)
Three-way 200Un(237milimetru) 5.5 5.7 Four-way 200Un(237milimetru) 5.95 5.67
225Un(266milimetru) 5.7 6.1 225Un(266milimetru) 5.95 6.7
300Un(354milimetru) 8.15 8.17 300Un(354πm) 8.6 8.57
JK-630
Category Support pipe type Weight
(KG)
Weight
(KG)
Category Support pipe type Weight
(KG)
Weigh
(KG)
Start well 200(240milimetru) 8.5 9.9 90° 200(240milimetru) 8.8 10.3
225(268milimetru) 8.7 10 225(268milimetru) 9.2 11.2
300(354milimetru) 10.4 11.5 300(354milimetru) 11.1 12.4
400(473milimetru) 12.1 13 400(473milimetru) 13.8 14.8
Staight-wa 200(240milimetru) 8.9 10.3 45° 200(240milimetru)
225(268milimetru) 9.3 10.6 225(268milimetru)
300(354milimetru) 11.3 12.4 300(354milimetru)
400(473milimetru) 13.9 14.8 400(473milimetru)
Three-way 200(240milimetru) 9.2 10.7 Four-way 200(240milimetru) 9.6 11.1
225(268milimetru) 9.8 11.2 225(268milimetru) 10.4 11.8
300(354milimetru) 12.1 13.3 300(354milimetru) 13 14.2
400(473milimetru) 15.7 16.6 400(473milimetru) 17.5 18.4
JK-700
Category Support pipe type Weight
(KG)
Weight
(KG)
Category Support pipe type Weight
(KG)
Weight
(KG)
Start well 200(240milimetru) 9.1 10.5 90° 200(240milimetru) 9.5 10.9
225(268milimetru) 9.3 10.6 225(268milimetru) 9.8 11.2
300(354milimetru) 9.9 11 300(354milimetru) 10.6 11.9
400(473milimetru) 12.6 13.5 400(473milimetru) 13.8 15.3
trai Wa 200(240milimetru) 9.5 10.9 45° 200(240milimetru)
225(268milimetru) 9.9 11.2 225(268milimetru)
300(354milimetru) 10.8 11.9 300(354milimetru)
400(473milimetru) 14.5 15.3 400(473milimetru)
Three-way 200(240milimetru) 9.8 11.3 Four-way 200(240milimetru) 10.2 11.7
225(268milimetru) 10.4 11.8 225(268milimetru) 11 12.4
300(354milimetru) 11.5 12.8 300(354milimetru) 12.5 13.7
400(473milimetru) 15.7 17.1 400(473milimetru) 17.5 18.9
JK-1000
Category Support pipe type Weight
(KG)
Weigh
(KG)
Category Support pipe type Weight
(KG)
Weigh
(KG)
Start well 300(354milimetru) 21.3 25.2 90° 300(354milimetru) 21.7 25.5
400(478milimetru) 25.3 27.3 400(478milimetru) 26.2 28.1
500(583milimetru) 27.3 29.3 500(583milimetru) 28.8 30.8
600(703milimetru) 31.4 35 600(703milimetru) 34.37 38.2
800(951πm) 40.2 43.2 800(951milimetru) 46.1 49.1
Sraight-way 300(354milimetru) 21.7 25.5 45° 300(354milimetru)
400(478milimetru) 26.6 28.1 400(478milimetru)
500(583milimetru) 28.8 30.8 500(583milimetru)
600(703milimetru) 35.5 37.86 600(703milimetru)
800(951πm) 47 50.1 800(951milimetru)
Three-way 300(354milimetru) 22.1 25.9 Four-way 300(354milimetru) 22.4 26.2
400(478milimetru) 27.9 28.9 400(478milimetru) 28.27 29.7
500(583milimetru) 30.3 32.3 500(583milimetru) 31.7 33.8
600(703milimetru) 38.5 41.6 600(703milimetru) 40.1 42.9
800(951πm) 52 55 800(951milimetru) 57 60

Obțineți o ofertă

    Detalii ambalare: Our PP Plastic Inspection Well are securely packed in containers or as per customer requirements, asigurându-vă că ajung la dvs. în stare perfectă. We use robust materials for packaging to protect the PP Plastic Inspection Well during transit, acomodarea diferitelor dimensiuni și cantități.

    Detalii livrare: Garantăm un proces rapid de livrare, comenzile fiind expediate în termen de 15 zile după confirmarea plății. Rețeaua noastră logistică eficientă se asigură că comanda dvs. ajunge prompt și în siguranță, indiferent de locația dvs.. Ne străduim să respectăm termene limită strânse, menținând în același timp cele mai înalte standarde de calitate a serviciilor și a produselor.

    Mai jos este imaginea noastră detaliată

    Zhongtong a obținut diverse certificări, inclusiv certificarea națională a întreprinderilor de înaltă tehnologie, Certificare de servicii post-vânzare de cinci stele, Certificarea sistemului de management al calității, și certificarea sistemului de management de mediu. Compania se mândrește cu o clientelă diversă, după ce a slujit peste 2,680 întreprinderi mari, inclusiv instituții de prestigiu precum Universitatea de Știință și Tehnologie din Nanjing, Universitatea Zhejiang, organisme guvernamentale, cum ar fi Taicang Water Affairs Bureau, facilități proeminente precum Gara de mare viteză Changzhou, și companii bine-cunoscute, cum ar fi Nongfu Spring, Grupul Country Garden, și linia de metrou Nanjing 4.

    Q: Care este MOQ-ul dvs.?

    Un: La cererea clientului.

    Q: De ce să ne alegeți pe noi?

    Un: Suntem un profesionist și lider al fabricii de țevi HDPE, Oferim servicii unice de sistem de conducte cu preț competitiv și timp de livrare rapid, și ne asigurăm că calitatea noastră este fără egal.

    Q: Cum să cumpărați produsul?

    Un: Contactați-ne prin e-mail sau prin Trade Manager, și informați-ne ce produs și cantitatea de care aveți nevoie, Vom contacta

    tu imediat. Mai mult specificați informațiile pe care le-ați furnizat mai rapid și mai ușor, veți obține oferta.

    Q: Pot să-mi fac propriul design și logo pe produs?

    Un: Da, facem OEM. Bun venit partener din întreaga lume, putem face produsul dvs. în China.

    Q: Care este termenul de plată?

    Un: Valoarea comenzii <=1.000USD, 100% în avans. Valoarea comenzii>=1.000USD, 30% T / T în avans, soldul înainte de expediere.
    Valoarea comenzii>20,000USD, 30% T / T în avans, echilibru L/C la vedere acceptabil.
    Valoarea comenzii>100,000USD, 100% L/C la vedere acceptabil.

    Q: Mai aveți multe întrebări?

    Un: Vă rugăm să utilizați tabelul de mai jos și să ne trimiteți întrebările dvs.. Vă mulțumesc.

    Prev:

    Următor:

    Lasă un mesaj