우리에 관해서 |

HDPE 골판지 파이프/

PP 플라스틱 검사 우물

상품 이름
Inspection Chamber
Capacity
DN315mm-1000mm
재료
HDPE+PP

Black
Supply Ability
10000 Sets per Month
Style
Underground
Sewer

  • 제품 세부 정보
  • Packing & Delivery
  • 우리 전시회
  • 우리의 인증
  • 우리 회사
  • 자주 묻는 질문(FAQ)

Plastic manhole is usually called “inspection well”, which is placed at interchange and turning point of drainage pipes, changes and plunge of caliber or slope, and in straight pipe at each certain distances. It is an affiliated drainage structure used to check, clean and dredge the pipes regularly. Our plastic manhole is made of Polymer Resin, adopts combinative structure and consists of manhole base, manhole shaft, manhole cover, cover base and concrete supported plate, 등. The critical manhole base adapts one-time molding, which can produce all types of manholes for two-way, three-way, Cross Tee 90°-165°any interchange. It uses reduce union, variable angle union and seal ring to change the connection of caliber and angle. Our manhole shaft uses PE pipe, corrugated pipe or winding pipe to adjust itself, so it is very much flexible, we can intercept the corresponding length according to the site buried length. We use rubber seal ring at the connection of manhole shaft, inlet (outlet) pipe and manhole base, so that small inner angle changes can be made. Wholesale best price high quality HDPE Plastic inspection Well.

PP Plastic Inspection Well Benefits:

No leakage, sealed connection between pipe and well.

Easy to carry and fast construction.

Corrosion of acid and alkali resistant media, long service life.

Convenient pipeline clearing, minimal maintenance.

Small footprintsmall excavation area.

Cost-effective and strong carrying capacity.

Environmentally friendly building materials, recyclable.

 

 

PP Plastic Inspection Well Application:

1.Well pit and foundation

1)Pave the bottom of the ditch with appropriate fine sand or plain soil, and level it.the pit depth is determined according to the axial line of the pipe and the axial line of the well joint.

2)Ditch bottom leveling.

3)1 meter inspection well, two people can easily put into the trench.

2. Inspection well connection pipe installation instructions

4) Measure the depth of the inspection well with a tape measure with a precision of 1 밀리미터, Drawing line on the corresponding pipe sockets as mark, and install a suitable rubber sealed loop between the first and second peaks of corrugated pipe socket end. The pipe must be inserted into the marking position when assembling.

5) In order to make the installation easier, it is necessary to apply a lubricant (such as soapy water, detergent, 등.) evenly on the outer surface of the seal ring on the pipe and the inner surface of the inspection well socket.

6) Pull the pipe into the well seat socket with a tightener, pull in the depth to the marking mark on the pipe, pull the wire tightener, and after confirming the link in place, correct the well seat again with the level.

3. Pitshaft installation

7) The length of the pitshaft should be the height from the bottom of the wellhead to the design ground minus the height from the top of the pitshaft to the ground. When the surface or pavement elevation is difficult to determine, the appropriate margin can be left.

8) Special tightening tools should be used when inserting the pitshaft, and do not hit it with heavy hammer and keep it vertical.

4. Backfill

9) Linking the pitshaft to the well block.

10) Working in the ditch.

11) Installing the manhole cover.

5.Manhole cover installation

12) Symmetrical backfilling of fine sand or plain soil.

13) Compaction after backfilling.

14) Lift the pressure ring into the pitshafte to be installed, gently lower the axial line of the pitshaft (manually corrections is allowed if necessary), install the manhole cover on the pressure ring and backfill it until completion.

 

Products Description

 

JK-315
Category Support pipe type 무게
(KG)
Weigh
(KG)
Category Support pipe type 무게
(KG)
무게
(KG)
Start well 200A(237밀리미터) 2.5 2.89 90° 200A(237밀리미터) 2.98 3.33
200B(208밀리미터) 2.5 2.82 200B(208밀리미터) 2.83 3.56
225A(266밀리미터) 2.86 3.14 225A(268πm) 3.4 3.76
Straight-way 200A(237밀리미터) 2.99 3.33 45° 200A(237밀리미터)
200B(208밀리미터) 2.84 3.19 200B(208πm)
225A(266밀리미터) 3.5 3.77 225A(266밀리미터)
Three-way 200A(237밀리미터) 3.37 3.76 Four-way 200A(237밀리미터) 3.75 4.2
200B(208πm) 3.17 3.56 200B(208πm) 3.78 3.93
225A(266밀리미터) 3.99 4.38 225A(266πm) 4.55 5
JK-450
Category Support pipe type 무게
(KG)
무게
(KG)
Category Support pipe type 무게
(KG)
무게
(KG)
Start well 200A(237밀리미터) 5.05 5.7 90° 200A(237밀리미터) 5.35 5.7
225A(266밀리미터) 4.6 5 225A(266πm) 5.2 5.6
300A(354πm) 5.5 6.2 300A(354πm) 6.6 7.2
Stiaicht-way 200A(237밀리미터) 5.35 5.7 45° 200A(237πm)
225A(266밀리미터) 5.2 5.6 225A(266πm)
300A(354밀리미터) 6.5 7.5 300A(354밀리미터)
Three-way 200A(237밀리미터) 5.5 5.7 Four-way 200A(237밀리미터) 5.95 5.67
225A(266밀리미터) 5.7 6.1 225A(266밀리미터) 5.95 6.7
300A(354밀리미터) 8.15 8.17 300A(354πm) 8.6 8.57
JK-630
Category Support pipe type 무게
(KG)
무게
(KG)
Category Support pipe type 무게
(KG)
Weigh
(KG)
Start well 200(240밀리미터) 8.5 9.9 90° 200(240밀리미터) 8.8 10.3
225(268밀리미터) 8.7 10 225(268밀리미터) 9.2 11.2
300(354밀리미터) 10.4 11.5 300(354밀리미터) 11.1 12.4
400(473밀리미터) 12.1 13 400(473밀리미터) 13.8 14.8
Staight-wa 200(240밀리미터) 8.9 10.3 45° 200(240밀리미터)
225(268밀리미터) 9.3 10.6 225(268밀리미터)
300(354밀리미터) 11.3 12.4 300(354밀리미터)
400(473밀리미터) 13.9 14.8 400(473밀리미터)
Three-way 200(240밀리미터) 9.2 10.7 Four-way 200(240밀리미터) 9.6 11.1
225(268밀리미터) 9.8 11.2 225(268밀리미터) 10.4 11.8
300(354밀리미터) 12.1 13.3 300(354밀리미터) 13 14.2
400(473밀리미터) 15.7 16.6 400(473밀리미터) 17.5 18.4
JK-700
Category Support pipe type 무게
(KG)
무게
(KG)
Category Support pipe type 무게
(KG)
무게
(KG)
Start well 200(240밀리미터) 9.1 10.5 90° 200(240밀리미터) 9.5 10.9
225(268밀리미터) 9.3 10.6 225(268밀리미터) 9.8 11.2
300(354밀리미터) 9.9 11 300(354밀리미터) 10.6 11.9
400(473밀리미터) 12.6 13.5 400(473밀리미터) 13.8 15.3
trai Wa 200(240밀리미터) 9.5 10.9 45° 200(240밀리미터)
225(268밀리미터) 9.9 11.2 225(268밀리미터)
300(354밀리미터) 10.8 11.9 300(354밀리미터)
400(473밀리미터) 14.5 15.3 400(473밀리미터)
Three-way 200(240밀리미터) 9.8 11.3 Four-way 200(240밀리미터) 10.2 11.7
225(268밀리미터) 10.4 11.8 225(268밀리미터) 11 12.4
300(354밀리미터) 11.5 12.8 300(354밀리미터) 12.5 13.7
400(473밀리미터) 15.7 17.1 400(473밀리미터) 17.5 18.9
JK-1000
Category Support pipe type 무게
(KG)
Weigh
(KG)
Category Support pipe type 무게
(KG)
Weigh
(KG)
Start well 300(354밀리미터) 21.3 25.2 90° 300(354밀리미터) 21.7 25.5
400(478밀리미터) 25.3 27.3 400(478밀리미터) 26.2 28.1
500(583밀리미터) 27.3 29.3 500(583밀리미터) 28.8 30.8
600(703밀리미터) 31.4 35 600(703밀리미터) 34.37 38.2
800(951πm) 40.2 43.2 800(951밀리미터) 46.1 49.1
Sraight-way 300(354밀리미터) 21.7 25.5 45° 300(354밀리미터)
400(478밀리미터) 26.6 28.1 400(478밀리미터)
500(583밀리미터) 28.8 30.8 500(583밀리미터)
600(703밀리미터) 35.5 37.86 600(703밀리미터)
800(951πm) 47 50.1 800(951밀리미터)
Three-way 300(354밀리미터) 22.1 25.9 Four-way 300(354밀리미터) 22.4 26.2
400(478밀리미터) 27.9 28.9 400(478밀리미터) 28.27 29.7
500(583밀리미터) 30.3 32.3 500(583밀리미터) 31.7 33.8
600(703밀리미터) 38.5 41.6 600(703밀리미터) 40.1 42.9
800(951πm) 52 55 800(951밀리미터) 57 60

견적 요청하기

    패킹 세부사항: Our PP Plastic Inspection Well are securely packed in containers or as per customer requirements, 완벽한 상태로 도착할 수 있도록 보장. We use robust materials for packaging to protect the PP Plastic Inspection Well during transit, 다양한 크기와 수량 수용.

    납품 세부사항: 신속한 배송 프로세스를 보장합니다., 주문이 발송되는 경우 15 결제 확인 후 일 수. 당사의 효율적인 물류 네트워크는 주문이 신속하고 안전하게 도착할 수 있도록 합니다., 위치에 관계없이. 우리는 최고 수준의 서비스와 제품 품질을 유지하면서 촉박한 마감일을 맞추기 위해 노력합니다.

    아래는 자세한 그림입니다.

    Zhongtong은 다양한 인증을 획득했습니다., 국가 하이테크 기업 인증 포함, 별 5개 A/S 인증, 품질경영시스템 인증, 및 환경 경영 시스템 인증. 이 회사는 다양한 고객을 자랑합니다, 봉사 한 후 2,680 대기업, Nanjing University of Science and Technology와 같은 권위 있는 기관을 포함하여, 절강 대학교, Taicang Water Affairs Bureau와 같은 정부 기관, Changzhou High-speed Railway Station과 같은 저명한 시설, 그리고 Nongfu 봄과 같은 유명한 회사, 컨트리 가든 그룹(Country Garden Group), 난징 지하철 노선 4.

    Q: 당신의 MOQ는 무엇입니까?

    A: 고객의 요구로.

    Q: 왜 우리를 선택 했죠?

    A: 우리는 HDPE 파이프 공장의 전문가이자 리더입니다., 우리는 경쟁력있는 가격과 빠른 배달 시간으로 파이프 라인 시스템 원 스톱 서비스를 제공합니다., 그리고 우리는 우리의 질이 아무도에 둘째가 된다는 것을 확실히 합니다.

    Q: 제품 구매 방법?

    A: 이메일 또는 무역 관리자로 저희에게 연락하십시오., 그리고 당신이 필요로 하는 어떤 제품 및 양을 저희에게 알리십시오, 연락 드리겠습니다

    당신은 즉시. 더 빠르고 쉽게 제공 한 정보를 지정하면 견적을 얻을 수 있습니다..

    Q: 제품에 나만의 디자인과 로고를 만들 수 있습니까??

    A: 예, 우리는 OEM을 합니다. 전 세계에서 환영받는 파트너, 우리는 중국에서 당신의 제품을 만들 수 있습니다.

    Q: 지불 기간은 무엇입니까?

    A: 주문 금액 <=1,000USD, 100% 사전에. 주문 금액>=1,000USD, 30% 미리 T/T, 선적 전 잔액.
    주문 금액>20,000미국 달러(USD), 30% 미리 T/T, 보자마자 받아들일 수 있는 균형 L/C.
    주문 금액>100,000미국 달러(USD), 100% 보자마자 받아들일 수 있는 L/C (신용장).

    Q: 더 궁금한 점이 있습니다.?

    A: 아래 표를 사용하여 질문을 보내주십시오. 감사합니다.

    이전:

    다음:

    메시지를 남기세요