Chi Siamo |

TUBO CORRUGATO IN HDPE/

Pozzetto di ispezione in plastica PP

Nome del prodotto
Inspection Chamber
Capacity
DN315mm-1000mm
Materiale
HDPE+PP

Colore

Nero
Supply Ability
10000 Sets per Month
Style
Underground
Digitare
Sewer

  • Dettagli del prodotto
  • Packing & Delivery
  • La nostra mostra
  • Le nostre Certificazioni
  • La nostra azienda
  • Domande frequenti

Plastic manhole is usually called “inspection well”, which is placed at interchange and turning point of drainage pipes, changes and plunge of caliber or slope, and in straight pipe at each certain distances. It is an affiliated drainage structure used to check, clean and dredge the pipes regularly. Our plastic manhole is made of Polymer Resin, adopts combinative structure and consists of manhole base, manhole shaft, manhole cover, cover base and concrete supported plate, etc. The critical manhole base adapts one-time molding, which can produce all types of manholes for two-way, three-way, Cross Tee 90°-165°any interchange. It uses reduce union, variable angle union and seal ring to change the connection of caliber and angle. Our manhole shaft uses PE pipe, corrugated pipe or winding pipe to adjust itself, so it is very much flexible, we can intercept the corresponding length according to the site buried length. We use rubber seal ring at the connection of manhole shaft, inlet (outlet) pipe and manhole base, so that small inner angle changes can be made. Wholesale best price high quality HDPE Plastic inspection Well.

PP Plastic Inspection Well Benefits:

No leakage, sealed connection between pipe and well.

Easy to carry and fast construction.

Corrosion of acid and alkali resistant media, long service life.

Convenient pipeline clearing, minimal maintenance.

Small footprintsmall excavation area.

Cost-effective and strong carrying capacity.

Environmentally friendly building materials, recyclable.

 

 

PP Plastic Inspection Well Application:

1.Well pit and foundation

1)Pave the bottom of the ditch with appropriate fine sand or plain soil, and level it.the pit depth is determined according to the axial line of the pipe and the axial line of the well joint.

2)Ditch bottom leveling.

3)1 meter inspection well, two people can easily put into the trench.

2. Inspection well connection pipe installation instructions

4) Measure the depth of the inspection well with a tape measure with a precision of 1 millimetro, Drawing line on the corresponding pipe sockets as mark, and install a suitable rubber sealed loop between the first and second peaks of corrugated pipe socket end. The pipe must be inserted into the marking position when assembling.

5) In order to make the installation easier, it is necessary to apply a lubricant (such as soapy water, detergent, etc.) evenly on the outer surface of the seal ring on the pipe and the inner surface of the inspection well socket.

6) Pull the pipe into the well seat socket with a tightener, pull in the depth to the marking mark on the pipe, pull the wire tightener, and after confirming the link in place, correct the well seat again with the level.

3. Pitshaft installation

7) The length of the pitshaft should be the height from the bottom of the wellhead to the design ground minus the height from the top of the pitshaft to the ground. When the surface or pavement elevation is difficult to determine, the appropriate margin can be left.

8) Special tightening tools should be used when inserting the pitshaft, and do not hit it with heavy hammer and keep it vertical.

4. Backfill

9) Linking the pitshaft to the well block.

10) Working in the ditch.

11) Installing the manhole cover.

5.Manhole cover installation

12) Symmetrical backfilling of fine sand or plain soil.

13) Compaction after backfilling.

14) Lift the pressure ring into the pitshafte to be installed, gently lower the axial line of the pitshaft (manually corrections is allowed if necessary), install the manhole cover on the pressure ring and backfill it until completion.

 

Products Description

 

JK-315
Category Support pipe type Weight
(KG)
Weigh
(KG)
Category Support pipe type Weight
(KG)
Weight
(KG)
Start well 200Un(237millimetro) 2.5 2.89 90° 200Un(237millimetro) 2.98 3.33
200B(208millimetro) 2.5 2.82 200B(208millimetro) 2.83 3.56
225Un(266millimetro) 2.86 3.14 225Un(268πm) 3.4 3.76
Straight-way 200Un(237millimetro) 2.99 3.33 45° 200Un(237millimetro)
200B(208millimetro) 2.84 3.19 200B(208πm)
225Un(266millimetro) 3.5 3.77 225Un(266millimetro)
Three-way 200Un(237millimetro) 3.37 3.76 Four-way 200Un(237millimetro) 3.75 4.2
200B(208πm) 3.17 3.56 200B(208πm) 3.78 3.93
225Un(266millimetro) 3.99 4.38 225Un(266πm) 4.55 5
JK-450
Category Support pipe type Weight
(KG)
Weight
(KG)
Category Support pipe type Weight
(KG)
Weight
(KG)
Start well 200Un(237millimetro) 5.05 5.7 90° 200Un(237millimetro) 5.35 5.7
225Un(266millimetro) 4.6 5 225Un(266πm) 5.2 5.6
300Un(354πm) 5.5 6.2 300Un(354πm) 6.6 7.2
Stiaicht-way 200Un(237millimetro) 5.35 5.7 45° 200Un(237πm)
225Un(266millimetro) 5.2 5.6 225Un(266πm)
300Un(354millimetro) 6.5 7.5 300Un(354millimetro)
Three-way 200Un(237millimetro) 5.5 5.7 Four-way 200Un(237millimetro) 5.95 5.67
225Un(266millimetro) 5.7 6.1 225Un(266millimetro) 5.95 6.7
300Un(354millimetro) 8.15 8.17 300Un(354πm) 8.6 8.57
JK-630
Category Support pipe type Weight
(KG)
Weight
(KG)
Category Support pipe type Weight
(KG)
Weigh
(KG)
Start well 200(240millimetro) 8.5 9.9 90° 200(240millimetro) 8.8 10.3
225(268millimetro) 8.7 10 225(268millimetro) 9.2 11.2
300(354millimetro) 10.4 11.5 300(354millimetro) 11.1 12.4
400(473millimetro) 12.1 13 400(473millimetro) 13.8 14.8
Staight-wa 200(240millimetro) 8.9 10.3 45° 200(240millimetro)
225(268millimetro) 9.3 10.6 225(268millimetro)
300(354millimetro) 11.3 12.4 300(354millimetro)
400(473millimetro) 13.9 14.8 400(473millimetro)
Three-way 200(240millimetro) 9.2 10.7 Four-way 200(240millimetro) 9.6 11.1
225(268millimetro) 9.8 11.2 225(268millimetro) 10.4 11.8
300(354millimetro) 12.1 13.3 300(354millimetro) 13 14.2
400(473millimetro) 15.7 16.6 400(473millimetro) 17.5 18.4
JK-700
Category Support pipe type Weight
(KG)
Weight
(KG)
Category Support pipe type Weight
(KG)
Weight
(KG)
Start well 200(240millimetro) 9.1 10.5 90° 200(240millimetro) 9.5 10.9
225(268millimetro) 9.3 10.6 225(268millimetro) 9.8 11.2
300(354millimetro) 9.9 11 300(354millimetro) 10.6 11.9
400(473millimetro) 12.6 13.5 400(473millimetro) 13.8 15.3
trai Wa 200(240millimetro) 9.5 10.9 45° 200(240millimetro)
225(268millimetro) 9.9 11.2 225(268millimetro)
300(354millimetro) 10.8 11.9 300(354millimetro)
400(473millimetro) 14.5 15.3 400(473millimetro)
Three-way 200(240millimetro) 9.8 11.3 Four-way 200(240millimetro) 10.2 11.7
225(268millimetro) 10.4 11.8 225(268millimetro) 11 12.4
300(354millimetro) 11.5 12.8 300(354millimetro) 12.5 13.7
400(473millimetro) 15.7 17.1 400(473millimetro) 17.5 18.9
JK-1000
Category Support pipe type Weight
(KG)
Weigh
(KG)
Category Support pipe type Weight
(KG)
Weigh
(KG)
Start well 300(354millimetro) 21.3 25.2 90° 300(354millimetro) 21.7 25.5
400(478millimetro) 25.3 27.3 400(478millimetro) 26.2 28.1
500(583millimetro) 27.3 29.3 500(583millimetro) 28.8 30.8
600(703millimetro) 31.4 35 600(703millimetro) 34.37 38.2
800(951πm) 40.2 43.2 800(951millimetro) 46.1 49.1
Sraight-way 300(354millimetro) 21.7 25.5 45° 300(354millimetro)
400(478millimetro) 26.6 28.1 400(478millimetro)
500(583millimetro) 28.8 30.8 500(583millimetro)
600(703millimetro) 35.5 37.86 600(703millimetro)
800(951πm) 47 50.1 800(951millimetro)
Three-way 300(354millimetro) 22.1 25.9 Four-way 300(354millimetro) 22.4 26.2
400(478millimetro) 27.9 28.9 400(478millimetro) 28.27 29.7
500(583millimetro) 30.3 32.3 500(583millimetro) 31.7 33.8
600(703millimetro) 38.5 41.6 600(703millimetro) 40.1 42.9
800(951πm) 52 55 800(951millimetro) 57 60

Richiedi un preventivo

    Particolari dell'imballaggio: Our PP Plastic Inspection Well are securely packed in containers or as per customer requirements, assicurandoti che ti raggiungano in perfette condizioni. We use robust materials for packaging to protect the PP Plastic Inspection Well during transit, Adatto a varie dimensioni e quantità.

    Dettagli di consegna: Garantiamo un processo di consegna rapido, con gli ordini che vengono spediti entro 15 giorni dopo la conferma del pagamento. La nostra efficiente rete logistica garantisce che il tuo ordine arrivi in modo rapido e sicuro, indipendentemente dalla tua posizione. Ci sforziamo di rispettare scadenze ravvicinate mantenendo i più alti standard di servizio e qualità del prodotto.

    Di seguito è riportata la nostra immagine dettagliata

    Zhongtong ha ottenuto varie certificazioni, compresa la certificazione nazionale per le imprese high-tech, Certificazione del servizio post-vendita a cinque stelle, Certificazione del Sistema di Gestione per la Qualità, e certificazione del sistema di gestione ambientale. L'azienda vanta una clientela diversificata, dopo aver servito oltre 2,680 grandi imprese, tra cui prestigiose istituzioni come l'Università della Scienza e della Tecnologia di Nanchino, Università di Zhejiang, enti governativi come l'Ufficio per gli affari idrici di Taicang, strutture di spicco come la stazione ferroviaria ad alta velocità di Changzhou, e aziende ben note come Nongfu Spring, Gruppo Giardino di campagna, e la linea della metropolitana di Nanchino 4.

    Q: Qual è il tuo MOQ?

    Un: Come richiesta del cliente.

    Q: Perchè sceglierci?

    Un: Siamo un professionista e leader della fabbrica di tubi in HDPE, Offriamo servizi one-stop del sistema di tubazioni con il prezzo competitivo ed i tempi di consegna veloci, e ci assicuriamo che la nostra qualità non sia seconda a nessuno.

    Q: Come acquistare il prodotto?

    Un: Contattaci via e-mail o tramite Trade Manager, e ci informa di quale prodotto e quantità hai bisogno, ti contatteremo

    si immediatamente. Più specifica le informazioni che hai fornito, più velocemente e più facilmente otterrai il preventivo.

    Q: Posso fare il mio design e logo sul prodotto?

    Un: Sì, facciamo OEM. Benvenuto partner da tutto il mondo, possiamo fare il vostro prodotto in Cina.

    Q: qual è il termine di pagamento?

    Un: Importo dell'ordine <=1.000 USD, 100% In anticipo. Importo dell'ordine>=1.000 USD, 30% T/T in anticipo, equilibrio prima della spedizione.
    Importo dell'ordine>20,000USD, 30% T/T in anticipo, bilanciamento L/C a vista accettabile.
    Importo dell'ordine>100,000USD, 100% L/C a vista accettabile.

    Q: Ho ancora altre domande?

    Un: Utilizzate la tabella sottostante e inviateci le vostre domande. Grazie.

    Prev:

    Prossimo:

    Lasciate un messaggio