من نحن |

HDPE الأنابيب المموجة/

PP Plastic Inspection Well

اسم المنتج
Inspection Chamber
Capacity
DN315mm-1000mm
مادي
HDPE+PP

لون

Black
Supply Ability
10000 Sets per Month
Style
Underground
نوع
Sewer

  • تفاصيل المنتج
  • Packing & Delivery
  • معرضنا
  • شهاداتنا
  • شركتنا
  • الأسئلة المتداولة

Plastic manhole is usually called “inspection well”, which is placed at interchange and turning point of drainage pipes, changes and plunge of caliber or slope, and in straight pipe at each certain distances. It is an affiliated drainage structure used to check, clean and dredge the pipes regularly. Our plastic manhole is made of Polymer Resin, adopts combinative structure and consists of manhole base, manhole shaft, manhole cover, cover base and concrete supported plate, الخ. The critical manhole base adapts one-time molding, which can produce all types of manholes for two-way, three-way, Cross Tee 90°-165°any interchange. It uses reduce union, variable angle union and seal ring to change the connection of caliber and angle. Our manhole shaft uses PE pipe, corrugated pipe or winding pipe to adjust itself, so it is very much flexible, we can intercept the corresponding length according to the site buried length. We use rubber seal ring at the connection of manhole shaft, inlet (outlet) pipe and manhole base, so that small inner angle changes can be made. Wholesale best price high quality HDPE Plastic inspection Well.

PP Plastic Inspection Well Benefits:

No leakage, sealed connection between pipe and well.

Easy to carry and fast construction.

Corrosion of acid and alkali resistant media, long service life.

Convenient pipeline clearing, minimal maintenance.

Small footprintsmall excavation area.

Cost-effective and strong carrying capacity.

Environmentally friendly building materials, recyclable.

 

 

PP Plastic Inspection Well Application:

1.Well pit and foundation

1)Pave the bottom of the ditch with appropriate fine sand or plain soil, and level it.the pit depth is determined according to the axial line of the pipe and the axial line of the well joint.

2)Ditch bottom leveling.

3)1 meter inspection well, two people can easily put into the trench.

2. Inspection well connection pipe installation instructions

4) Measure the depth of the inspection well with a tape measure with a precision of 1 المليمتر, Drawing line on the corresponding pipe sockets as mark, and install a suitable rubber sealed loop between the first and second peaks of corrugated pipe socket end. The pipe must be inserted into the marking position when assembling.

5) In order to make the installation easier, it is necessary to apply a lubricant (such as soapy water, detergent, etc.) evenly on the outer surface of the seal ring on the pipe and the inner surface of the inspection well socket.

6) Pull the pipe into the well seat socket with a tightener, pull in the depth to the marking mark on the pipe, pull the wire tightener, and after confirming the link in place, correct the well seat again with the level.

3. Pitshaft installation

7) The length of the pitshaft should be the height from the bottom of the wellhead to the design ground minus the height from the top of the pitshaft to the ground. When the surface or pavement elevation is difficult to determine, the appropriate margin can be left.

8) Special tightening tools should be used when inserting the pitshaft, and do not hit it with heavy hammer and keep it vertical.

4. Backfill

9) Linking the pitshaft to the well block.

10) Working in the ditch.

11) Installing the manhole cover.

5.Manhole cover installation

12) Symmetrical backfilling of fine sand or plain soil.

13) Compaction after backfilling.

14) Lift the pressure ring into the pitshafte to be installed, gently lower the axial line of the pitshaft (manually corrections is allowed if necessary), install the manhole cover on the pressure ring and backfill it until completion.

 

Products Description

 

JK-315
Category Support pipe type ثقل
(KG)
Weigh
(KG)
Category Support pipe type ثقل
(KG)
ثقل
(KG)
Start well 200A(237المليمتر) 2.5 2.89 90° 200A(237المليمتر) 2.98 3.33
200B(208المليمتر) 2.5 2.82 200B(208المليمتر) 2.83 3.56
225A(266المليمتر) 2.86 3.14 225A(268πm) 3.4 3.76
Straight-way 200A(237المليمتر) 2.99 3.33 45° 200A(237المليمتر)
200B(208المليمتر) 2.84 3.19 200B(208πm)
225A(266المليمتر) 3.5 3.77 225A(266المليمتر)
Three-way 200A(237المليمتر) 3.37 3.76 Four-way 200A(237المليمتر) 3.75 4.2
200B(208πm) 3.17 3.56 200B(208πm) 3.78 3.93
225A(266المليمتر) 3.99 4.38 225A(266πm) 4.55 5
JK-450
Category Support pipe type ثقل
(KG)
ثقل
(KG)
Category Support pipe type ثقل
(KG)
ثقل
(KG)
Start well 200A(237المليمتر) 5.05 5.7 90° 200A(237المليمتر) 5.35 5.7
225A(266المليمتر) 4.6 5 225A(266πm) 5.2 5.6
300A(354πm) 5.5 6.2 300A(354πm) 6.6 7.2
Stiaicht-way 200A(237المليمتر) 5.35 5.7 45° 200A(237πm)
225A(266المليمتر) 5.2 5.6 225A(266πm)
300A(354المليمتر) 6.5 7.5 300A(354المليمتر)
Three-way 200A(237المليمتر) 5.5 5.7 Four-way 200A(237المليمتر) 5.95 5.67
225A(266المليمتر) 5.7 6.1 225A(266المليمتر) 5.95 6.7
300A(354المليمتر) 8.15 8.17 300A(354πm) 8.6 8.57
JK-630
Category Support pipe type ثقل
(KG)
ثقل
(KG)
Category Support pipe type ثقل
(KG)
Weigh
(KG)
Start well 200(240المليمتر) 8.5 9.9 90° 200(240المليمتر) 8.8 10.3
225(268المليمتر) 8.7 10 225(268المليمتر) 9.2 11.2
300(354المليمتر) 10.4 11.5 300(354المليمتر) 11.1 12.4
400(473المليمتر) 12.1 13 400(473المليمتر) 13.8 14.8
Staight-wa 200(240المليمتر) 8.9 10.3 45° 200(240المليمتر)
225(268المليمتر) 9.3 10.6 225(268المليمتر)
300(354المليمتر) 11.3 12.4 300(354المليمتر)
400(473المليمتر) 13.9 14.8 400(473المليمتر)
Three-way 200(240المليمتر) 9.2 10.7 Four-way 200(240المليمتر) 9.6 11.1
225(268المليمتر) 9.8 11.2 225(268المليمتر) 10.4 11.8
300(354المليمتر) 12.1 13.3 300(354المليمتر) 13 14.2
400(473المليمتر) 15.7 16.6 400(473المليمتر) 17.5 18.4
JK-700
Category Support pipe type ثقل
(KG)
ثقل
(KG)
Category Support pipe type ثقل
(KG)
ثقل
(KG)
Start well 200(240المليمتر) 9.1 10.5 90° 200(240المليمتر) 9.5 10.9
225(268المليمتر) 9.3 10.6 225(268المليمتر) 9.8 11.2
300(354المليمتر) 9.9 11 300(354المليمتر) 10.6 11.9
400(473المليمتر) 12.6 13.5 400(473المليمتر) 13.8 15.3
trai Wa 200(240المليمتر) 9.5 10.9 45° 200(240المليمتر)
225(268المليمتر) 9.9 11.2 225(268المليمتر)
300(354المليمتر) 10.8 11.9 300(354المليمتر)
400(473المليمتر) 14.5 15.3 400(473المليمتر)
Three-way 200(240المليمتر) 9.8 11.3 Four-way 200(240المليمتر) 10.2 11.7
225(268المليمتر) 10.4 11.8 225(268المليمتر) 11 12.4
300(354المليمتر) 11.5 12.8 300(354المليمتر) 12.5 13.7
400(473المليمتر) 15.7 17.1 400(473المليمتر) 17.5 18.9
JK-1000
Category Support pipe type ثقل
(KG)
Weigh
(KG)
Category Support pipe type ثقل
(KG)
Weigh
(KG)
Start well 300(354المليمتر) 21.3 25.2 90° 300(354المليمتر) 21.7 25.5
400(478المليمتر) 25.3 27.3 400(478المليمتر) 26.2 28.1
500(583المليمتر) 27.3 29.3 500(583المليمتر) 28.8 30.8
600(703المليمتر) 31.4 35 600(703المليمتر) 34.37 38.2
800(951πm) 40.2 43.2 800(951المليمتر) 46.1 49.1
Sraight-way 300(354المليمتر) 21.7 25.5 45° 300(354المليمتر)
400(478المليمتر) 26.6 28.1 400(478المليمتر)
500(583المليمتر) 28.8 30.8 500(583المليمتر)
600(703المليمتر) 35.5 37.86 600(703المليمتر)
800(951πm) 47 50.1 800(951المليمتر)
Three-way 300(354المليمتر) 22.1 25.9 Four-way 300(354المليمتر) 22.4 26.2
400(478المليمتر) 27.9 28.9 400(478المليمتر) 28.27 29.7
500(583المليمتر) 30.3 32.3 500(583المليمتر) 31.7 33.8
600(703المليمتر) 38.5 41.6 600(703المليمتر) 40.1 42.9
800(951πm) 52 55 800(951المليمتر) 57 60

إقتبس

    تفاصيل التعبئة: Our PP Plastic Inspection Well are securely packed in containers or as per customer requirements, ضمان وصولها إليك في حالة ممتازة. We use robust materials for packaging to protect the PP Plastic Inspection Well during transit, تستوعب مختلف الأحجام والكميات.

    تفاصيل التسليم: نحن نضمن عملية تسليم سريعة, مع إرسال الطلبات في الداخل 15 الأيام التالية لتأكيد الدفع. تضمن شبكتنا اللوجستية الفعالة وصول طلبك بسرعة وأمان, بغض النظر عن موقعك. نحن نسعى جاهدين للوفاء بالمواعيد النهائية الضيقة مع الحفاظ على أعلى معايير الخدمة وجودة المنتج.

    فيما يلي صورتنا التفصيلية

    حققت Zhongtong شهادات مختلفة, بما في ذلك شهادة المؤسسة الوطنية للتكنولوجيا الفائقة, شهادة خدمة ما بعد البيع من فئة الخمس نجوم, شهادة نظام إدارة الجودة, وشهادة نظام الإدارة البيئية. تفتخر الشركة بعملاء متنوعين, بعد أن خدم أكثر من 2,680 الشركات الكبيرة, بما في ذلك المؤسسات المرموقة مثل جامعة نانجينغ للعلوم والتكنولوجيا, جامعة تشجيانغ, الهيئات الحكومية مثل مكتب شؤون المياه في تايتسانغ, مرافق بارزة مثل محطة تشانغتشو للسكك الحديدية عالية السرعة, وشركات معروفة مثل نونغ فو الربيع, كانتري جاردن جروب, وخط مترو نانجينغ 4.

    Q: ما هو موك الخاص بك?

    A: حسب طلب الزبون.

    Q: لماذا أخترتنا?

    A: نحن المهنية والرائدة في مصنع أنابيب HDPE, نحن نقدم خدمات نظام خطوط الأنابيب وقفة واحدة بأسعار تنافسية ووقت التسليم السريع, ونحن نضمن أن جودتنا لا يعلى عليها.

    Q: كيفية شراء المنتج?

    A: تواصل معنا عبر البريد الإلكتروني أو عن طريق مدير التجارة, وأبلغنا بالمنتج والكمية التي تحتاجها, سوف نتصل بك

    أنت على الفور. حدد المزيد من المعلومات التي قدمتها بشكل أسرع وأسهل ستحصل على عرض الأسعار.

    Q: هل يمكنني عمل التصميم والشعار الخاص بي على المنتج?

    A: نعم, نحن نفعل تصنيع المعدات الأصلية. نرحب بالشريك من جميع أنحاء العالم, يمكننا أن نجعل المنتج الخاص بك في الصين.

    Q: ما هو مصطلح الدفع?

    A: مبلغ الطلب <= 1,000 دولار أمريكي, 100% مقدما. مبلغ الطلب>= 1,000 دولار أمريكي, 30% T / T مقدما, الرصيد قبل الشحن.
    مبلغ الطلب>20,000دولار, 30% T / T مقدما, توازن L / C في الافق مقبول.
    مبلغ الطلب>100,000دولار, 100% L / C في الافق مقبولة.

    Q: لا يزال لديك المزيد من الأسئلة?

    A: يرجى استخدام الجدول أدناه وإرسال أسئلتك إلينا. شكرا.

    السابق:

    مقبل:

    اترك رسالة